Skip to the stories
Wednesday, 14 October 2026
Saved

Next edition

6:23

Rail & Road Trips

Chennai Metro opens first section of new Yellow Line

Chennai Metro has opened a 15-kilometre section of its new Yellow Line, providing a transit link between the city's western suburbs and urban center.

FTMQ Travel, written by our newsroom0 views

Share
Picture: RailTech

Indian Prime Minister Narendra Modi and Tamil Nadu Chief Minister Joseph Vijay opened the first section of the Chennai Metro Yellow Line on October 11, according to RailTech. Inaugural passenger services began on October 11, followed by full operational services the next day. [1]

The newly opened elevated stretch spans 15 kilometres between Poonamallee Bypass and Vadapalani, as reported by RailTech, Railway Gazette International, and IndexBox. RailTech and Railway Supply both report that the route includes 11 stations, with stops serving Porur Junction, Porur Bypass, Iyappanthangal, and Vadapalani. [1][2][3][5]

RailTech and DT Next report that no fewer than 25,474 passenger journeys were recorded during the first five hours of service. However, the New Indian Express reported that commuters expressed concern over trains operating with only three coaches. [1][4][6]

The route forms the first operational stretch of Phase II Corridor 4, designed to connect the western suburbs with the city center to reduce travel times. The metro network is operated by Chennai Metro Rail Limited, a joint venture between the Government of India and the Government of Tamil Nadu. [1][7]

Share

In short

  • The 15-kilometre Yellow Line stretch connects Poonamallee Bypass and Vadapalani across 11 stations.
  • Inaugural services commenced on October 11, recording over 25,000 passenger journeys in the first five hours.
  • The line represents the first operational stretch of Phase II Corridor 4.

Sources

Every paragraph above points to the numbered items it rests on. Read the originals here.

  1. [1]Chennai Metro opens first section of the Yellow Line as Phase II expansion gathers paceRailTech, 11h ago (the report this story comes from)
  2. [2]Chennai Metro opens first section of the Yellow Line as Phase II expansion gathers paceRailway Gazette International, 12h ago
  3. [3]Chennai Metro Yellow Line Opens: 15 km Poonamallee–Vadapalani Section Inaugurated - News and StatisticsIndexBox, 10h ago
  4. [4]Chennai metro yellow Line instant hit, but just 3 coaches in each train a concernThe New Indian Express, 2d ago
  5. [5]Chennai Metro opens 11 Phase II stations between Poonamallee and VadapalaniRailway Supply, 18h ago
  6. [6]Over 25,000 passengers take ride on first day of new yellow line of Chennai MetroDT Next, 1d ago

Background

  1. [7]Chennai Metro on Wikipedia
  2. [8]Yellow Line (Gaza) on Wikipedia
  3. [9]Chennai Metro on Grokipedia

Our newsroom writes these reports with the help of software, from the 9 sources listed and nothing else, and checks them against those sources. Facts can still be wrong or move on; the originals are the record. Spotted a mistake? Write to daniel@monsterkong.com.

Earlier reports of ours on the same people and subjects.

More in Rail & Road Trips

Get the day in one email

Reports like this one, the top news of the last 24 hours, every morning. Free, one email a day; readers can comment under every report.

By signing up you agree to our terms and privacy policy. Unsubscribe any time.

Comments

Loading

Join the conversation

Comments are open to readers of our daily email: the top news of the last 24 hours, every morning, free. Sign up and the comment box opens.

Already on the list? Enter the same address and we will send a sign-in link.

By signing up you agree to our terms and privacy policy. Unsubscribe any time.